S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 4.1 | 139 | 569.9 |
2 | Boring holes 3.5m deep in ordinary soil (for cast in situ piles) and getting out the soil (under ramming if any shall be paid for separately) and disposal of the surplus excavated soil as directed within a lead of 50m for-Diameter of piles.-200 mm | 6 | 760.2 | 4561.2 |
3 | Extra for under-ramming inside the bore holes for under reamed piles.-200mm | 6 | 302.5 | 1815 |
4 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 13.53 | 282.7 | 3824.931 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:5:10 (1 cement, 5sand, 10metal) | 1.702 | 2941.3 | 5006.0926 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 9.474 | 4836 | 45816.264 |
7 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand) | 2.75 | 3679.1 | 10117.525 |
8 | Half brick masonry in class 25 open bhatta or pajawa burnt brick in super structure including placing of 6mm iron bar at every 3rd layer of brick.-In cement mortar 1:3 | 22.37 | 499.8 | 11180.526 |
9 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 777.62 | 60.8 | 47279.296 |
10 | Providing hard drown steel for R.C.C. work upto floor two level. | 660 | 77.8 | 51348 |
11 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand) | 177.86 | 142.7 | 25380.622 |
12 | Hammer dressed 15cm thick stone paving laid in camber with 20mm lime mortar (1:2) bedding and cement pointing in cement mortar 1:3 for roadways. | 75 | 250 | 18750 |
13 | White glazed tiles 6mm thick in flooring, treads of steps and landings laid on a bed of 12mm thick cement mortar 1:3 finished with flush pointing in white cement. | 52.82 | 926 | 48911.32 |
14 | 25mm cement concrete toping 1:2:4 (1cement, 2sand, 4graded stone aggregate 12.5mm nominal size) finished with floating coat of neat cement (base concrete to be paid separately) | 8.2 | 568.9 | 4664.98 |
15 | Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-3 coats | 44.04 | 104.6 | 4606.584 |
16 | Providing and fixing 25mm bore galvanised M.S. tube (medium grade) outlet in cement mortar 1:3 (1cement, 3fine sand) including cutting and making good the wall. | 10.57 | 3933.3 | 41574.981 |
17 | Fixing water meter and stop cock in galvanised mild steel tube of the following nominal bore including necessary fittings such as mild steel galvanised jamnut, socket etc cutting and threading the tube and making long screws complete (water meter, jam nut | 177.86 | 17.5 | 3112.55 |
18 | Transportation of fertile soil with in 5 km range from plantation site for filling in diging pits quantity will we 1/4 of pit size each pit. | 12 | 214 | 2568 |
19 | Supply of foresty or horticulture Plant cost 7 to 9 feet .height | 177.86 | 76 | 13517.36 |