S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum | 1 | 4260.88 | 4260.88 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 5.85 | 3474.1 | 20323.485 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 11.7 | 2291.4 | 26809.38 |
5 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 324.48 | 1161.8 | 376980.864 |
6 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing | 624 | 150.6 | 93974.4 |
7 | Transportation of metal | 633.75 | 133.83 | 84814.7625 |
8 | Transportation of metal | 11.92 | 232.13 | 2766.9896 |
9 | Transportation of sand | 119.01 | 1000 | 119010 |
10 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 1036.36 | 44.7 | 46325.292 |
11 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 633.75 | 39.3 | 24906.375 |
12 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2957.5 | 1.8 | 5323.5 |
13 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 11.92 | 96.2 | 1146.704 |
14 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 93.6 | 96.2 | 9004.32 |
15 | Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 20m And lift upto1.5m-Dense or hard soil. | 2957.5 | 14 | 41405 |
16 | Collection of hard moorum including stacking at quarry. | 633.75 | 142.5 | 90309.375 |