Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:13:03 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SYAU(P)
Work Code: 1703004084/RC/22012034298108 (kharanga nirman marghat se mahua wali gali )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2015 Work start date : 5/2/2016
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 84/4530 Sanction Date : 4/1/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
211903 62097 0 0 0 0 0 62100 0 274000
Financial Sanction Details
Financial\Administrative Sanction No: 84/31 Financial\Administrative Sanction Date 28/1/2016
Fin. Sanc. Amt. (in Rs) NREGA:274000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
274000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency19230.9329230.932
2Dag-beling-Single spade stroke minimum 75mm deep4000.3120
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.720226.1162792
4Transportation of sand140.4123.3117312.724
5Transportation rates for Masonry stone.102.6404.1841468.868
6Loading of metal in truck, dumper etc.140.428.263967.704
7Unloading of metal in truck, dumper etc.140.414.131983.852
8Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.140.444.16191.64
9Collection of hard moorum including stacking at quarry.140.4140.719754.28
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.81013.811178
Total Activity 274000
S.NoMaterialQuantityUnit PriceTotal
1contangency192679267
2खण्‍डा परिवहन102.6404.1841468.868
3मुरम परिवहन (1)140.480.9211361.168
Total Material 62100