S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1461 | 0.8 | 1168.8 |
2 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Loose or soft soil | 228 | 129.7 | 29571.6 |
3 | Lossening of hard soil by ploughing the existing gound | 123.56 | 2.7 | 333.612 |
4 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 123.56 | 50 | 6178 |
5 | Field Technical Supervisior Charge-FTSC | 1 | 732.69 | 732.69 |