S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1700 | 7.60931764705882 | 12935.84 |
2 | Providing stone chips under stone pitching | 480 | 612.636270833333 | 294065.41 |
3 | (a) Other then black trap Basalt or granite | 83.6 | 367.086124401914 | 30688.4 |
4 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 2571.75 | 2.73487314085739 | 7033.41 |
5 | (I) 0.5 Km. Lead | 83.6 | 145.180023923445 | 12137.05 |
6 | (III) 1.5 Km. Lead | 992.25 | 110.846238347191 | 109987.18 |
7 | (VIII) 4.0 Km. Lead | 1579.5 | 152.598594491928 | 241029.48 |
8 | (a) Boulders | 150 | 927.3486 | 139102.29 |
9 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 141.75 | 490.630617283951 | 69546.89 |
10 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 2571.75 | 23.1489686011471 | 59533.36 |
11 | b (iii) Dense or hard soil for Tank Work | 889.875 | 156.081247366203 | 138892.8 |
12 | c (iii) Hard moorum for Tank Work | 1615.5 | 207.90022903126 | 335862.82 |
13 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 30.375 | 659.777777777778 | 20040.75 |
14 | b (i) Hard rock requiring blasting for Tank Work | 37.5 | 688.421866666667 | 25815.82 |