Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:38:13 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: GUDA
Work Code: 1711006047/IF/22012034300005 (नाडेप निर्माण कार्य खजिया बसोर पिता जंगली बसोर )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 15/8/2016 Work start date : 24/9/2016
Present status : Not Exist Proposed Status : NADEP Composting
Tech Sanction Details
Technical Sanction No. : 047/221 Sanction Date : 26/8/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
3000 8000 0 0 0 0 0 8000 0 11000
Financial Sanction Details
Financial\Administrative Sanction No: 047/02/04 Financial\Administrative Sanction Date 27/8/2016
Fin. Sanc. Amt. (in Rs) NREGA:11000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
11000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard110001000
2Contingency0.2691000269
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil81.21.32107.184
4Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.0.87882767.34
5Providing and laying in foundation, plinth and under floors lime concrete with 40mm nominal size graded stone aggregates (metal) and 40% lime mortar. i/c ramming in layers and curing complete excluding cost of form work.-Lime mortar 1:2 (1lime putty, 2sand)0.153474.1521.115
6Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:4 (1cement, 4sand)2.382998.57136.43
7TRANSPORTATION OF MATERIAL1.110001100
Total Activity 11000
S.NoMaterialQuantityUnit PriceTotal
1Bricks12003.54200
2Cement30061800
3GITTI0.5850425
4Sand1.57501125
5Transpotation Charges0.41000400
Total Material 8000