State: PUNJAB District: SAS NAGAR MOHALI Block: KHARAR Panchayat: GABE MAJRA
Work Code: 2619005131/WH/9989010782 (renovation of pond at gabe majra)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 4/4/2020 Work start date : 30/11/2020
Present status : Weak Embankment Proposed Status : Renovtion of Community Ponds for Comm
Tech Sanction Details
Technical Sanction No. : 2619005/2020-2021/35796/TS Sanction Date : 1/12/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
95620.45 20308.27 0 0 0 0 0 20400 0 115928.72
Financial Sanction Details
Financial\Administrative Sanction No: 2619005/2020-2021/35796/AS Financial\Administrative Sanction Date 1/12/2020
Fin. Sanc. Amt. (in Rs) NREGA:115929 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
116000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Supplying and planting permanent trees including digging of earth pits size 75cmx75cmx75 cm deep, refilling the excavated earth with manure supplied @ 0.113 cum each and watering Supplying through tractor tanker.50295.918214795.91
2Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil (i) 1.5 meter vertical lift and 15 meter horizontal lead594.3150.82180716809789633.4
3Miscellaneous Works (6.1) jungle cleaning including uprooting of ordinary vegetation and bush wood.780.3610.7890845250918419.37
Total Activity 113000
S.NoMaterialQuantityUnit PriceTotal
13-Display Board130803080
2MR14001-Supply of insecticide chlorpyriphos . per pit2.5230575
3MR14003-Supply of 38mm dia 1.50 mtr. Long bamboo sticks to support the plants to safe guard the tree from storm.50351750
4MR14004-Supply of plants through contractor/nursery average rate for sapling above 6 feet height and 2.5 cm caliper size.501005000
5MR14005-Tractor with tanker charges for watering the plants through tanker one tanker of 4000 ltrs. Water capacity is sufficient for 100 No plants. It will take 3 Hours.0.22034406.8
6MR1791-Supplying of farm yard manure duly screened and stacked at site of work.6159954
7MR1792-Loading /Unloading charges646.55279.3
8MR1793-Carriage of manure 5 km lead61711026
9MR1794-Preliminary watering Charges 5 cm. layer over the surface .Rate for 100 liter = 0.45200.459
Total Material 13100