S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 12000 | 4.1 | 49200 |
2 | Contingency | 1 | 56504 | 56504 |
3 | Stacking without boxing.-Puddle earth, moorum, sand or kankar | 2350 | 10.5 | 24675 |
4 | Transportation of metal | 2350 | 119.88 | 281718 |
5 | Transportation of metal | 450 | 152.37 | 68566.5 |
6 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 1980 | 25 | 49500 |
7 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 2350 | 30.2 | 70970 |
8 | Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP: | 150 | 360 | 54000 |
9 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 1980 | 81.2 | 160776 |
10 | Collection of puddle earth including stacking at quarry | 92.8 | 130.8 | 12138.24 |
11 | Collection of soft moorum including stacking at quarry. | 2257 | 112.8 | 254589.6 |