State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: BARHA BADA
Work Code: 1734004056/RC/22012034205446 (खेतसडक-परसरामकेखेतसेसंजयढिमोलेकेखेतकीओरGPबारहबडा)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 18/10/2013 Work start date : 18/2/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 290-13/14 Sanction Date : 30/12/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
655300 427300 0 0 0 0 0 428000 0 1082600
Financial Sanction Details
Financial\Administrative Sanction No: 09-2013/14 Financial\Administrative Sanction Date 1/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1082600 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1083000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.120004.149200
2Contingency15650456504
3Stacking without boxing.-Puddle earth, moorum, sand or kankar235010.524675
4Transportation of metal 2350119.88281718
5Transportation of metal 450152.3768566.5
6Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making19802549500
7Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact235030.270970
8Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:15036054000
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work198081.2160776
10Collection of puddle earth including stacking at quarry92.8130.812138.24
11Collection of soft moorum including stacking at quarry.2257112.8254589.6
Total Activity 1083000
S.NoMaterialQuantityUnit PriceTotal
1contigency11291912919
2Gravel or moorum15036054000
3roller235030.270970
4Transportanion of hard Muram450112.9550827.5
5Transportanion of Soft Muram235080.46189081
6रोलर19802549500
Total Material 428000