Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:57:12 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: JAURIKOTWAL
Work Code: 1702001083/RC/22012034190195 (cc road from phop road to ravi shribas house)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2013 Work start date : 25/10/2013
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 102/2013-14 Sanction Date : 10/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
50000 33200 0 0 173600 0 0 207000 0 256800
Financial Sanction Details
Financial\Administrative Sanction No: 02/102 Financial\Administrative Sanction Date 2/10/2013
Fin. Sanc. Amt. (in Rs) NREGA:83200 Panchparmeshwar
173600
Scheme 2
0
Scheme 3
0
Total
257000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Dag-beling-Double spade "v" shaped stroke 100mm deep2400.5120
3Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.44.72504.822574.656
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)51.122928.1149684.472
5False work for R.C.C. and P.C.C. work in plinth and foundation93.36127.311884.728
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)142.46.1868.64
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 44.726268.32
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 51.12321635.84
9Transportation of 20 MM metal43.456708.230775.5392
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.11980019800
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work60.7281.24930.464
12contingency11101411014
Total Activity 257000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)12626533390
2Convergence Amount1173600173600
Total Material 207000