Work Code: 1703004071/WC/22012034599170 (Check Dam Nirman Beerwal ke khet ke pas rithodan)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2019-2020 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 26/1/2020 Work start date : 5/12/2020
Present status : Non-existent Proposed Status : Constr of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 4071/488 Sanction Date : 2/12/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Public Contribution scheme2 scheme3 Total
862700 575100 0 0 58800 0 0 634000 0 1496600
Financial Sanction Details
Financial\Administrative Sanction No: 4071/014 Financial\Administrative Sanction Date 3/12/2020
Fin. Sanc. Amt. (in Rs) NREGA:1496600 Public Contribution
0
Scheme 2
0
Scheme 3
0
Total
1497000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.25004.411000
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil220.91496.221251.9268
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)15.734250439397.936
4Plum cement concrete 1:3:6 with 75% graded metal of 40mm size and 25% plums of 150mm size.230.0972504576162.888
5False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift357.016147.852766.9648
6Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading - 2 (Size ranging from 63 mm to 45 mm)222.821496.2110563.7802
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1103471103471
8Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil800052.7421600
9contingency1160385.5160385.5
Total Activity 1497000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL115001500
240 M.M. Gitti221950209950
3bolader11.224291.763274.71424
4CEMENT (Beg)1000300300000
5Centring & Shuttering58004000
6Convergence Amount112144.9812144.98
7Display board150005000
8SAND.11088096800
9Treanportesion Charges10123.031230.3
Total Material 634000