State: MADHYA PRADESH District: KATNI Block: DHIMERKHEDA Panchayat: ATRIYA
Work Code: 1744006066/WC/22012034507788 (नवीन तालाब निर्माण कार्य मिडहा भोपार)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2019-2020 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2019 Work start date : 19/11/2019
Present status : Existing Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 1744006/2019-2020/77202/TS Sanction Date : 12/12/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
825914.55 477005.74 38847.6 34263.45 0 0 0 551000 0 1376031.34
Financial Sanction Details
Financial\Administrative Sanction No: 1744006/2019-2020/77202/AS Financial\Administrative Sanction Date 12/12/2019
Fin. Sanc. Amt. (in Rs) NREGA:1376319 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1377000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.30006.0599118179.73
2(b) C.C. 1:3:6 (1cement, 3sand, 6metal)45.643125.19434706398142633.87
322cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.661.5195.094497354497129055.01
4Add extra item no. 1274 for quarried boulder pitching.661.5154.24500377929102033.07
5(a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work)7332.177994542974081596.47
6(XXVII) 40 Km. Lead145.53550.62859891431380132.98
7(I) 0.5 Km. Lead --1472.0587.175041608641128326.02
8(VI) 3.0 Km. Lead733122.43716234652189746.44
9For earthen dam - puddle filling of good clay ( excluding cost of puddle earth & Water) including mixing, kneading by tamping , ramming & laying etc.733223.74164001.42
10(e) Dense or hard soil for Tank Work, Over 3m up to 6m depth29413238808
11(f) Hard moorum for Tank Work, Over 3m up to 6m depth196175.82397959183734461.5
12c (iii) Hard moorum for Tank Work588.82165.56759281274497489.51
13(c) Hard moorum60160.9946666666679659.68
14Collection of puddle earth including stacking at quarry733167.854720327422123037.51
15Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.3532.923.6001805871630312719.15
16Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.2944.168.240701742468200907.45
17Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13530.013530.01
Total Activity 1377000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper4.5748854047.99
20084-Hire charges of Diesel truck - 9 tonne (without POL)57.47812242128865.9002
30367-Portland Cement10.0697551155494.1167
40368-White cement 0.0004157446.2976
50983-Fine sand (zone IV)21.49781076.2523137.00725
61235-Diesel oil280.31036819061.1004
75001-Mobil oil10.1768182.91861.33672
87753-Boulder 50 mm to 200 mm198.4514729172.15
97900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
10MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT29.73152515608.775
11MR6032-Snowcem/ durocem0.00072778919.4523
12MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)10.97766827486.7232
13MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver15.898170811255.8548
Total Material 298000