S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1600 | 1600 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 800 | 1.8 | 1440 |
3 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 900 | 23.1 | 20790 |
4 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 153.6 | 114.6 | 17602.56 |
5 | Labour only for Random/ uncoursed rubble masonry in plinth and foundation, stones laid dry, well bounded, faced with selected stones and built with through stones evenly placed at the rate of two per sqm. | 2.01 | 26.358 | 52.97958 |
6 | 1911 UNLOADING MATERIAL | 1 | 750 | 750 |
7 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 975 | 50 | 48750 |