Work Code: 1702001027/RC/22012034320959 (Sudur Road shiv singh ke pura se bichholi ki ore)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 5/5/2016 Work start date : 20/1/2017
Present status : No Road Proposed Status : Construction of Gravel Road Roads for Community
Tech Sanction Details
Technical Sanction No. : Ts/188 Sanction Date : 19/1/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1150000 1150000 0 0 0 0 0 1150000 0 2300000
Financial Sanction Details
Financial\Administrative Sanction No: As/219 Financial\Administrative Sanction Date 20/1/2017
Fin. Sanc. Amt. (in Rs) NREGA:2300000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
2300000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises26000378000
2Transportation of metal 773992.16713226.24
3Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making339318.462431.2
4Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact773024.7190931
5Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp260201.6452426.4
6Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau1365576.9787468.5
7Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:408500204000
8Site clearance, cutting grass, raking into heaps and removing off the premises11542815428
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work11940419404
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work179947994
11Excavating post holes (or similar holes) upto 0.5cum including getting out the excavated soil, than returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc., disposing of-Dense or hard soil.42.383222136548.36
12Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil13113514755
13Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum15.63405304
14Collection of soft moorum including stacking at quarry.5223011960
Total Activity 2300000
S.NoMaterialQuantityUnit PriceTotal
12043 soil Compaction material4168.192.16384132.096
22048-Construction of gravel ba561.6288.45161993.52
3Compaction of Earth Work276.335598086.5
4Compaction of Selected soil3347.592.16308505.6
5sub grade transportion2140.6492.16197281.3824
Total Material 1150000