Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:15:45 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KISUPURA
Work Code: 1702001014/WC/22012034843234 (नवीन तालाब निर्माण शांतीधाम के पास किशुपुरा)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2021 Work start date : 8/10/2021
Present status : Non-existent Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 1702001/2021-2022/501401/TS Sanction Date : 16/10/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
666445.09 732716.13 3582.85 58810.56 0 0 0 796000 0 1461554.63
Financial Sanction Details
Financial\Administrative Sanction No: 1702001/2021-2022/501401/AS Financial\Administrative Sanction Date 17/10/2021
Fin. Sanc. Amt. (in Rs) NREGA:1461554 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1462000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(I) 1.50 m. to 3.00 m.16569.918272946859916424.66
2(II) 3.00 m to 4.50 m62117.3710786.77
3(b) C.C. 1:3:6 (1cement, 3sand, 6metal)19.43175.7819587628961610.17
4Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)1293920.69441860465505769.58
5(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)1.245302.241935483876574.78
6False work for R.C.C. and P.C.C. work in plinth and foundation.520.4172.00918524212189513.58
7(e) In Cement mortar 1:6 (1cement, 6sand)14.852865.6525252525342554.94
822cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.330210.34951515151569415.34
9(XXXI) 70 Km. Lead87.451001.1135506003487547.38
10Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete.303.6163.56749011857749659.09
11Site clearance, cutting grass, raking into heaps and removing off the premises35752.666911888111899534.21
12a (i) Loose or soft soil for Road Work4968100.975670289855501647.13
13(a) Loose or soft soil115.890.807253886010410515.48
Total Activity 1462000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper15.349988513584.6615
20084-Hire charges of Diesel truck - 9 tonne (without POL)15.54503519224234851.96889598
30297-Stone Aggregate(single size): 10 mm nominal size14.462366309111.2868
40367-Portland Cement48.61446755511267914.3303925
50982-Coarse sand (zone III)0.66305251028.16681.7240584
60983-Fine sand (zone IV)72.9686351076.2578532.49341875
71157-Stone for masonry work17.226519.758953.2135
81235-Diesel oil434.731310646829561.72912352
95001-Mobil oil15.58332239182.92850.189665131
107753-Boulder 50 mm to 200 mm9914714553
11MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT13.52698755257101.6684375
12MR6007-Hier Charges for Centering1.238800990.4
13MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)101.2840468269075.71528
14MR6091-WOOD-Kail wood 2nd class1.951515825.630883.6584
Total Material 569000