S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (I) 1.50 m. to 3.00 m. | 1656 | 9.9182729468599 | 16424.66 |
2 | (II) 3.00 m to 4.50 m | 621 | 17.37 | 10786.77 |
3 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 19.4 | 3175.78195876289 | 61610.17 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15)
(a) C.C. 1:2:4 (1cement, 2sand, 4metal) | 129 | 3920.69441860465 | 505769.58 |
5 | (c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size) | 1.24 | 5302.24193548387 | 6574.78 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation. | 520.4 | 172.009185242121 | 89513.58 |
7 | (e) In Cement mortar 1:6 (1cement, 6sand) | 14.85 | 2865.65252525253 | 42554.94 |
8 | 22cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth. | 330 | 210.349515151515 | 69415.34 |
9 | (XXXI) 70 Km. Lead | 87.45 | 1001.11355060034 | 87547.38 |
10 | Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete. | 303.6 | 163.567490118577 | 49659.09 |
11 | Site clearance, cutting grass, raking into heaps and removing off the premises | 3575 | 2.66691188811189 | 9534.21 |
12 | a (i) Loose or soft soil for Road Work | 4968 | 100.975670289855 | 501647.13 |
13 | (a) Loose or soft soil | 115.8 | 90.8072538860104 | 10515.48 |