Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 05:48:12 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: Takalkheda
Work Code: 1725007082/RC/580 (ग्रेवल मार्ग प्रधानमंत्री ग्राम सडक से रामकिशन गंग)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/5/2012 Work start date : 25/5/2012
Present status : Earthern road Proposed Status : Earthern road
Tech Sanction Details
Technical Sanction No. : 157wwqw Sanction Date : 7/5/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
300000 199000 0 0 0 0 0 199000 0 499000
Financial Sanction Details
Financial\Administrative Sanction No: 02wwqw Financial\Administrative Sanction Date 12/5/2012
Fin. Sanc. Amt. (in Rs) NREGA:499000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
499000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil113.5873.48336.772
2Dag-beling-Double spade "v" shaped stroke 100mm deep3930.5196.5
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)90.093177.8286288.002
4Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used100.98118.611976.228
5False work for R.C.C. and P.C.C. work in plinth and foundation223.5154.234463.7
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)1056.3661.5
7Collection of approved soil having CBR not less then 12, including stacking at quarry.210.08105.322121.424
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 98.181.5147.27
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 98.0920420010.36
10Transportation of metal 99.0920420214.36
11Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.190.24133.7625446.5024
12Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7144.0723.63400.052
13work charge16500065000
Total Activity 499000
S.NoMaterialQuantityUnit PriceTotal
1Gravel or moorum901200108000
2PhotoCopy & Stationary1002200
3Photograph1040400
4pipe21200024000
5पानी टेकर4090036000
6रोलर15180027000
7साईनबोर्ड 125002500
Total Material 199000