S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Mud Mortar | 1 | 500 | 500 |
2 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 31.5 | 882 | 27783 |
3 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used | 225 | 211.4 | 47565 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 30 | 147.8 | 4434 |
5 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 1 | 175500 | 175500 |
6 | Demolition of brick work above G.L. upto floor two level including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead.-In mud mortar . | 141.75 | 1858.7 | 263470.725 |
7 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 252 | 96.2 | 24242.4 |