S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (c) Masonry stones, pitching stones or boulders | 13.5 | 40.2733333333333 | 543.69 |
2 | Collection of boulders or rubble from excavated materials. | 13.5 | 71.597037037037 | 966.56 |
3 | (XVIII) 16 Km. Lead | 27 | 251.938888888889 | 6802.35 |
4 | (b) Dense or hard soil | 13.5 | 137.823703703704 | 1860.62 |
5 | (I)1.50 m. to 2.00 m. | 4.5 | 140.624444444444 | 632.81 |
6 | (II)2.00 m. to 2.50 m. | 4.5 | 149.951111111111 | 674.78 |
7 | (III)2.50 m. to 3.00 m. | 4.5 | 159.28 | 716.76 |
8 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 4.5 | 208.028888888889 | 936.13 |
9 | Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry. | 9 | 169.047777777778 | 1521.43 |