Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 06:04:25 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: HEERAPUR RAIYAT
Work Code: 1725007034/WC/22012035038410 (Shanti dham ke pass Nirmal neer)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2022 Work start date : 16/1/2023
Present status : Existing Proposed Status : Block Plantation of Forestry-in Fields-Community
Tech Sanction Details
Technical Sanction No. : 1725007/2022-2023/12003/TS Sanction Date : 31/1/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
226442.75 126578.02 131495.87 14596.84 0 0 0 273000 0 499113.48
Financial Sanction Details
Financial\Administrative Sanction No: 1725007/2022-2023/12003/AS Financial\Administrative Sanction Date 4/3/2023
Fin. Sanc. Amt. (in Rs) NREGA:499113 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
500000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m57.0861.85301331464613530.57
2(b) C.C. 1:3:6 (1cement, 3sand, 6metal)2.5783426.489526764938833.49
3Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)1.954366.892307692318515.44
4(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)10.2775631.9850150822257879.91
5(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars457.22190.168343098851541226.86
6(X) 5.0 Km. Lead9210.2733333333331892.46
7(X) 5.0 Km. Lead9164.5622222222221481.06
8(XVII) 14 Km. Lead2.316270.729706390328627.01
9(XVII) 14 Km. Lead0.35270.74285714285794.76
10(b) Dense or hard soil89.34159.75039176180914272.1
11(I)1.50 m. to 2.00 m.29.78216.464405641376446.31
12(II)2.00 m. to 2.50 m.29.78227.2763599731366768.29
13(XVIII)10.00 m. to 10.50 m.7.257830.5773735703466027.5
14(XIX)10.50 m. to 11.00 m.7.257855.5877084194576209
15(XX)11.00 m. to 11.50 m.6.924880.5979202772966097.26
16(XXI)11.50 m. to 12.00 m.6.924905.6080300404396270.43
17(XXII)12.00 m. to 12.50 m.6.924930.6181398035826443.6
18(XXIV)13.00 m. to 13.50 m.6.924980.6398035817456789.95
19(XXVI)14.00 m. to 14.50 m.6.9241030.660023108037136.29
20(XXVII)14.50 m. to 15.00 m.6.9241055.670132871177309.46
21(XXIX)16.00 m. to 16.50 m.6.9241105.691796649347655.81
22(III)2.50 m. to 3.00 m.29.78558.72666218938916638.88
23(XXXI)17.00 m. to 17.50 m.6.9241155.712016175628002.15
24(X)6.00 m. to 6.50 m.14.22940.16526019690613369.15
25(XI)6.50 m. to 7.00 m.14.22959.66807313642713646.48
26(XII)7.00 m. to 7.50 m.11.096979.16997116077910864.87
27(XIII)7.50 m. to 8.00 m.9.875998.6724050632919861.89
28(XIV)8.00 m. to 8.50 m.9.8751018.1751898734210054.48
29(XV)8.50 m. to 9.00 m.9.8751037.6779746835410247.07
30(XVI)9.00 m. to 9.50 m.7.5991057.179892091068033.51
31(XVII)9.50 m. to 10.00 m.7.5991076.682458218198181.71
32(XXIII)12.50 m. to 13.00 m.6.9241221.236279607168455.84
33(XXV)13.50 m. to 14.00 m.6.9241271.257943385338802.19
34(XXVII)14.50 m. to 15.00 m.6.9241321.278162911619148.53
35(XXVIII)15.50 m. to 16.00 m.6.9241346.288272674759321.7
36(XXX)16.50 m. to 17.00 m.6.9241396.309936452929668.05
37(XXXII)17.50 m. to 18.00 m.6.9241446.330155979210014.39
38(IV)3.00 m. to 3.50 m.22.219840.38930644943518672.61
39(V)3.50 m. to 4.00 m.22.219856.44403438498619029.33
40(VI)4.00 m. to 4.50 m.19.355872.49857917850716887.21
41(VII)4.50 m. to 5.00 m.19.355888.55334538878817197.95
42(VIII)5.00 m. to 5.50 m.16.689904.60842471088715097.01
43(IX)5.50 m. to 6.00 m.16.689920.66331116304215364.95
44Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9172.891556.01
45Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9241.1244444444442170.12
46Provision for Mate3539213720
Total Activity 496000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.480510001480.5
20084-Hire charges of Diesel truck - 9 tonne (without POL)0.8418379221001767.859632
30297-Stone Aggregate(single size): 10 mm nominal size2.475446501609.036
40325-Blasting powder155.639418568715.807408
50326-Blasting fuse (fuse wire)169.7003284751.6084
60367-Portland Cement4.4993640028795.52
70983-Fine sand (zone IV)6.7138110256881.65525
81005-Twisted steel/deformed bars4.8008205690033125.66145
91235-Diesel oil10.662562891001066.256289
103-Display Board / CIB136003600
115001-Mobil oil0.37777747270101.9999169
127335-Binding wire4.5722160274.3326
13MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT1.6757500837.85
14MR6007-Hier Charges for Centering10.2776786967.806
15MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)8.947317907068.3749
Total Material 108000