State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: RAMSALAIYA
Work Code: 1711006060/LD/22012034304741 (Shantidham kuamangad)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 26/1/2017 Work start date : 1/4/2017
Present status : NEW Proposed Status : Crematorium
Tech Sanction Details
Technical Sanction No. : 4166/136227/01/01 Sanction Date : 5/3/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
22000 158000 0 0 0 0 0 158000 0 180000
Financial Sanction Details
Financial\Administrative Sanction No: 00060/001 Financial\Administrative Sanction Date 5/3/2017
Fin. Sanc. Amt. (in Rs) NREGA:180000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
180000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard020000
2Contingency110781078
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil11.23127.71434.071
4Filling foundation and around masonry work with moorum I/c ramming layers and watering.12.54247.93108.666
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.3925623561.18
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)2.6491612781.6
7Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand)2.32984.56864.35
8Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height1204.5471.786365.518
9Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars142.6851.77376.556
1010mm thick cement plaster on fair side of wall in-Cement mortar 1:5 (1cement, 5sand)12.696.21212.12
11Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.80 mm thick sheet.51.2800.340975.36
12Providing ridges or hips 600mm over all in plain G.I. sheet class III fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter G.I. limpet bitumen washers complete.-0.80 mm thick sheet.6.4528.93384.96
13Cement washing (Portland cement) 3 coats.-White cement10.824.9268.92
14Painting two coats (excluding priming coat) on new steel and other metal surfaces with Aluminium paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter.-2 coats150005000
15Lossening of hard soil by ploughing the existing gound1252.7337.5
16Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed125506250
Total Activity 180000
S.NoMaterialQuantityUnit PriceTotal
1Binding wire275150
2Bricks11303.53955
3CEMENT303009000
4CONTANGANCY113251325
5GI SHEET51.2760.438932.48
6GITTI 20 MM3.38312004059.6
7Iron angles, Trusses, wind tie1204.5468.982992.806
8IRON SARIYA142.68476705.96
9MASON (PERDAY)123754500
10sand2.35001150
11Senttring15.3660.8933.888
12Transportation charges of mate135003500
Total Material 158000