S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Contingency | 1 | 7422.95 | 7422.95 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 240 | 0.3 | 72 |
3 | Providing and fixing in cement mortar 1:6 (1cement, 6sand) flag stone slab over drains.-30 mm thick | 84 | 221.5 | 18606 |
4 | Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar. | 360 | 226.1 | 81396 |
5 | Stacking without boxing.-Puddle earth, moorum, sand or kankar | 155.25 | 11.3 | 1754.325 |
6 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 54 | 332.78 | 17970.12 |
7 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 155.25 | 167.31 | 25974.8775 |
8 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 122.4 | 44.1 | 5397.84 |
9 | Collection of hard moorum including stacking at quarry. | 122.4 | 140.7 | 17221.68 |
10 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil. | 444 | 13.8 | 6127.2 |