Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 05:11:47 AM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: NAHAR MAL
Work Code: 1725007049/IF/22012034848471 (kapil dhara kup nirman(rameshvar shyamlal))
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/8/2021 Work start date : 1/9/2021
Present status : Existing Proposed Status : Constr of Irrigation Open Well for Individuals
Tech Sanction Details
Technical Sanction No. : 1725007/2021-2022/438512/TS Sanction Date : 9/11/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
107222.32 80517.45 62262.25 730.6 0 0 0 144000 0 250732.62
Financial Sanction Details
Financial\Administrative Sanction No: 1725007/2021-2022/438512/AS Financial\Administrative Sanction Date 13/11/2021
Fin. Sanc. Amt. (in Rs) NREGA:250898 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
251000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m57.858.51782006920423382.33
2(b) C.C. 1:3:6 (1cement, 3sand, 6metal)2.583173.321705426368187.17
3Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)1.953920.692307692317645.35
4(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)6.195308.2374798061432857.99
5(b) Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars330.5372.241430429915623877.96
6(XXVII) 40 Km. Lead5.97488.855946398662918.47
7(X) 5.0 Km. Lead9195.2633333333331757.37
8(X) 5.0 Km. Lead9152.8144444444441375.33
9(XV) 10 Km. Lead2.32210.271551724138487.83
10(XXXI) 70 Km. Lead5.34643.3314606741573435.39
11(XV) 10 Km. Lead0.35210.62857142857173.72
12(b) Dense or hard soil60.24151.1238379814089103.7
13(I)1.50 m. to 2.00 m.20.18204.7720515361744132.3
14(II)2.00 m. to 2.50 m.20.182154338.7
15(XVIII)10.00 m. to 10.50 m.7.26783.9490358126725691.47
16(XIX)10.50 m. to 11.00 m.7.26807.6019283746565863.19
17(XX)11.00 m. to 11.50 m.6.92832.0780346820815757.98
18(XXI)11.50 m. to 12.00 m.6.92855.752890173415921.81
19(III)2.50 m. to 3.00 m.20.18527.02973240832510635.46
20(X)6.00 m. to 6.50 m.8.67878.3402537485587615.21
21(XI)6.50 m. to 7.00 m.8.67896.7912341407157775.18
22(XII)7.00 m. to 7.50 m.8.31914.6919374247897601.09
23(XIII)7.50 m. to 8.00 m.8.31933.1311672683517754.32
24(XIV)8.00 m. to 8.50 m.7.95951.9044025157237567.64
25(XV)8.50 m. to 9.00 m.7.95970.3509433962267714.29
26(XVI)9.00 m. to 9.50 m.7.6988.9157894736847515.76
27(XVII)9.50 m. to 10.00 m.7.61007.363157894747655.96
28(IV)3.00 m. to 3.50 m.9.81784.1845056065247692.85
29(V)3.50 m. to 4.00 m.9.81799.3781855249747841.9
30(VI)4.00 m. to 4.50 m.9.42814.6687898089177674.18
31(VII)4.50 m. to 5.00 m.9.42829.8641188959667817.32
32(VIII)5.00 m. to 5.50 m.9.04844.9811946902667638.63
33(IX)5.50 m. to 6.00 m.9.04860.1758849557527775.99
34Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.9163.5677777777781472.11
35Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9228.1222222222222053.1
36Citizen Information Board of size 0.6 meter x 0.9 meter ( Individual works )12289.272289.27
Total Activity 251000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.0842365885959.5493025
20084-Hire charges of Diesel truck - 9 tonne (without POL)1.9773546522424433.2291253
30297-Stone Aggregate(single size): 10 mm nominal size1.57564630992.6532
40325-Blasting powder78.06976852.494097.88212232
50326-Blasting fuse (fuse wire)85.122814.511235.131828
60367-Portland Cement3.2414463551117863.6105593
70368-White cement 0.0002189157443.4463616
80983-Fine sand (zone IV)5.01227111076.255394.456771375
91005-Twisted steel/deformed bars3.4705335542818838.055838
101235-Diesel oil40.75217703682771.14803804
115001-Mobil oil1.4547404182.9266.07201916
127335-Binding wire3.3052755.58183.7069066
137900-Modular common burnt clay bricks of class designation 7.5150.84.13622.804
14MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT1.7277525907.0425
15MR6007-Hier Charges for Centering6.1878004949.6
16MR6032-Snowcem/ durocem0.00041792778911.6130231
17MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)6.226216824246.27522
Total Material 67800