S.No | Material | Quantity | Unit Price | Total |
1 | 3-Display Board | 1 | 3000 | 3000 |
2 | MR14001-Supply of insecticide chlorpyriphos . per pit | 1 | 230 | 230 |
3 | MR14003-Supply of 38mm dia 1.50 mtr. Long bamboo sticks to support the plants to safe guard the tree from storm. | 20 | 35 | 700 |
4 | MR14004-Supply of plants through contractor/nursery average rate for sapling above 6 feet height and 2.5 cm caliper size. | 20 | 100 | 2000 |
5 | MR14005-Tractor with tanker charges for watering the plants through tanker one tanker of 4000 ltrs. Water capacity is sufficient for 100 No plants. It will take 3 Hours. | 0.08 | 2034 | 162.72 |
6 | MR1791-Supplying of farm yard manure duly screened and stacked at site of work. | 2.4 | 159 | 381.6 |
7 | MR1792-Loading /Unloading charges | 2.4 | 46.55 | 111.72 |
8 | MR1793-Carriage of manure 5 km lead | 2.4 | 171 | 410.4 |
9 | MR1794-Preliminary watering Charges 5 cm. layer over the surface .Rate for 100 liter = 0.45 | 8 | 0.45 | 3.6 |