S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 4025 | 3 | 12075 |
3 | Contingency | 1 | 27300 | 27300 |
4 | Work charge | 0 | 0 | 0 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 18 | 2562.5 | 46125 |
6 | TRANSPORTATION OF MATERIAL | 0 | 0 | 0 |
7 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 364 | 165 | 60060 |
8 | Collection of puddle earth including stacking at quarry | 0 | 0 | 0 |
9 | Transportation rates for Masonry stone. | 0 | 0 | 0 |
10 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 0 | 0 | 0 |
11 | Labour only for item no.2219 | 0 | 0 | 0 |
12 | FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc. | 245.7 | 474 | 116461.8 |
13 | FOR EARTHEN DAM - Puddle filling of good clay (excluding cost of puddle earth and water) including mixing kneeding by tamping, ramming and laying etc. | 0 | 0 | 0 |
14 | FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders | 75.6 | 574.6 | 43439.76 |
15 | Lossening of hard soil by ploughing the existing gound | 172.46 | 142.2 | 24523.812 |
16 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 5639.5 | 183.16 | 1032930.82 |