State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SHYAMPUR(P)
Work Code: 1703004074/RS/22012034516527 (nali nirman lakhan k dwar se nare ki or)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2021 Work start date : 28/4/2021
Present status : Not Exist Proposed Status : Constr of Open/Covered Grey Water Drain for Comm
Tech Sanction Details
Technical Sanction No. : 4074/257 Sanction Date : 22/4/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
248200 165000 0 0 23500 0 0 189000 0 436700
Financial Sanction Details
Financial\Administrative Sanction No: 4074/05 Financial\Administrative Sanction Date 23/4/2021
Fin. Sanc. Amt. (in Rs) NREGA:413200 15th Finance Commission
23500
Scheme 2
0
Scheme 3
0
Total
437000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.40.588235721
2Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used20.253307.466974.85
3False work for R.C.C. and P.C.C. work in plinth and foundation40147.85912
4Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:8 (1cement, 8sand)1082082.1224866.8
5Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing240127.630624
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.161218.1561218.15
7Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed21652.711383.2
Total Activity 437000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL17.2120020640
240 M.M. METAL30.759018113
3Cement25030075000
4Centering and Shuttering12017.812017.81
5Display board150005000
6Gravel or moorum13.34177.92373.186
7SAND4780037600
8Treanportesion Charges10825727756
Total Material 189000