State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: UKASGHAT
Work Code: 1734004009/RC/22012034200186 (CCROAD EVEM NALI ADIM JATI JHEENE MUKASA SE PRATMI)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 1/11/2011 Work start date : 22/1/2014
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 455/11-12 Sanction Date : 19/10/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
34700 22600 0 0 100000 0 0 123000 0 157300
Financial Sanction Details
Financial\Administrative Sanction No: 4717 Financial\Administrative Sanction Date 16/11/2012
Fin. Sanc. Amt. (in Rs) NREGA:57300 Panchparmeshwar
100000
Scheme 2
0
Scheme 3
0
Total
158000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency126101260
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)29.662435.372230.998
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)21.331836.839178.944
4False work for R.C.C. and P.C.C. work in plinth and foundation55.1125.16893.01
5Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.25.7644511463.2
6Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 50 Kms. and part there of upto 100 Kms.9.68161.11559.448
7Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 100 Kms.19.454458655.25
8Transportation of sand22.6185.861941.2946
9Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.46.93114.35364.099
10Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.746.9319.7924.521
11Site clearance, cutting grass, raking into heaps and removing off the premises270.181.4378.252
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work4.2767.8289.506
13Collection of soft moorum including stacking at quarry.46.9394.24420.806
14Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.255.9610.72738.772
Total Activity 158000
S.NoMaterialQuantityUnit PriceTotal
11904 transportation of cement22.19161.13574.809
220 MM B.T.METAL25.761955023.2
320 mm metal transport25.76412.0610614.6656
440 mm Metal19.451953792.75
5CEMENT(BEGS)290.426576956
6Centering and Shuttering55.178.74336.37
7contengency 21346346
8Display board1800800
9Mason (semi skilled)4178.17712.68
10mixer machin (perday)28001600
11SAND22.61952147.95
12Transportaion of muram (trip)46.9352.922483.5356
13Transportanion of hard Muram22.6152.921196.5212
14transportation of 40mm metal19.45412.068014.567
15Vibrator (Per Day)25001000
Total Material 123000