S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 5000 | 6.541948 | 32709.74 |
2 | (I) 0.5 Km. Lead -- | 2160 | 89.4432962962963 | 193197.52 |
3 | (II) 1.0 Km. Lead | 397.5 | 96.8037987421384 | 38479.51 |
4 | (a) 300 mm dia | 22.5 | 434.500888888889 | 9776.27 |
5 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete. | 2025 | 17.3501086419753 | 35133.97 |
6 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complet compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete. | 2160 | 19.1225138888889 | 41304.63 |
7 | Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7), as per clause 407 of specifications for rural roads(MORD), i/c required leads and lifts of materials etc. complete. | 397.5 | 35.8796729559748 | 14262.17 |
8 | (b) Above item having material strength not less than 30%CBR | 450 | 547.945666666667 | 246575.55 |
9 | (A) With Reinforced cement concrete (ii) Ordinary Kilometer Stone (Pre cast) | 3 | 1607.46 | 4822.38 |
10 | (A) With Reinforced cement concrete (iii) 200 m stone (precast) | 8 | 488.29875 | 3906.39 |
11 | b (i) Dense or hard soil for Road Work | 2025 | 134.187501234568 | 271729.69 |
12 | Collection of approved soil having CBR not less then 5, including stacking at quarry. | 2160 | 181.206800925926 | 391406.69 |
13 | Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry. | 588.75 | 182.494997876858 | 107443.93 |
14 | Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed. | 397.5 | 73.6689308176101 | 29283.4 |