State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: BHORI(P)
Work Code: 1703004061/RC/22012034552707 (GRAVEL KHET ROAD SHITLA ROAD SE BADERA JHEEL)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 9/12/2020 Work start date : 15/12/2020
Present status : Earthern road Proposed Status : Repair & maint of Gravel Road Roads for Comm
Tech Sanction Details
Technical Sanction No. : 1703004/2020-2021/459459/TS Sanction Date : 17/12/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
831092.34 590729.78 490.52 1221.49 0 0 0 593000 0 1423534.13
Financial Sanction Details
Financial\Administrative Sanction No: 1703004/2020-2021/459459/AS Financial\Administrative Sanction Date 26/12/2020
Fin. Sanc. Amt. (in Rs) NREGA:1423534 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1424000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.50006.54194832709.74
2(I) 0.5 Km. Lead --216089.4432962962963193197.52
3(II) 1.0 Km. Lead397.596.803798742138438479.51
4(a) 300 mm dia22.5434.5008888888899776.27
5Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete.202517.350108641975335133.97
6Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complet compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete.216019.122513888888941304.63
7Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7), as per clause 407 of specifications for rural roads(MORD), i/c required leads and lifts of materials etc. complete.397.535.879672955974814262.17
8(b) Above item having material strength not less than 30%CBR450547.945666666667246575.55
9(A) With Reinforced cement concrete (ii) Ordinary Kilometer Stone (Pre cast)31607.464822.38
10(A) With Reinforced cement concrete (iii) 200 m stone (precast)8488.298753906.39
11b (i) Dense or hard soil for Road Work2025134.187501234568271729.69
12Collection of approved soil having CBR not less then 5, including stacking at quarry.2160181.206800925926391406.69
13Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.588.75182.494997876858107443.93
14Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.397.573.668930817610129283.4
Total Activity 1421000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.1191885105.4035
20038-Tractor with ripper attachment10.3135212421905.874
30055-Smooth Wheeled Roller 8 to 10 tonne109.150523625759.518
40057-Water Tanker 5 to 6 KL Capacity97.82511811543.35
50084-Hire charges of Diesel truck - 9 tonne (without POL)61.90622242138793.7004
60295-Stone Aggregate(single size):20 mm nominal size108797.4486123.52
70297-Stone Aggregate(single size): 10 mm nominal size0.13163082.53
80367-Portland Cement0.43855112413.818
90765-Hessian cloth1.1258.910.0125
100830-Enamel paint1.3085160.13209.530105
110983-Fine sand (zone IV)0.60341076.25649.40925
121005-Twisted steel/deformed bars0.235554281278.294
131235-Diesel oil180.62786812282.6904
141703-R.C.C. pipes NP2 class 300 mm dia22.5316.247115.4
151717-R.C.C. collars NP2 class 300 mm dia6.7563.72430.11
163-Display Board135003500
175001-Mobil oil6.593182.91205.8597
187335-Binding wire0.224355.5812.466594
19MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.6193525325.1325
20MR6039-Water5869500.0529347.5
21MR6051-Tractor with rotavator182103780
22MR6056-Well Graded granular material (For Gravel Road)432246.19106354.08
23MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.262682178.684
Total Material 454000