Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2018 Work start date : 5/9/2018
Present status : Existing Proposed Status : Block Plantation-Farm Forestry in fields for Comm
Tech Sanction Details
Technical Sanction No. : 078/1844 Sanction Date : 31/7/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
635823 280162 0 0 0 0 0 281000 0 915985
Financial Sanction Details
Financial\Administrative Sanction No: 078/15 Financial\Administrative Sanction Date 1/8/2018
Fin. Sanc. Amt. (in Rs) NREGA:915900 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
916000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)52.7185.49770.58
2Dag-beling-Single spade stroke minimum 75mm deep0.3824247.2
3Dag-beling-Double spade "v" shaped stroke 100mm deep0.3400120
4Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.88246.3540880.7
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)3307.432.45107325.13
6Labour only for item no. 0413 (for any proportion of cement concrete)45832.4514862.1
7False work for R.C.C. and P.C.C. work in plinth and foundation147.8123.618268.08
8Labour only for item no. 043062.5301875
9Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.1079432.6466775.4
10Labour only for item no 050489.58423.637946.088
11Labour only for item no.1027, 1028 and 1029-Flush pointing54.61318.471984.64
12Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing78.51318.4103494.4
13Providing and fixing M.S. fan clamps of 16mm dia mild steel in existing RCC slab including cutting chase and making good.467.346.3521659.355
14Demolition above G.L. upto floor two level including disposal of unserviceable materials within 100 metres lead.-Unreinforced cement concrete upto 15 cm thickness.64.25.62360.804
15Stacking without boxing.-Puddle earth, moorum, sand or kankar0.10.10.01
16Transportation of metal 59.11257387.5
17Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-2 (Size ranging from 63 mm to 45 mm)510.95.622871.258
18Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed52.7185.49770.58
Total Activity 916000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.355.727.589810.206
240 M.M. METAL136.734.764751.692
3Bord150005000
4Cement112.328.28930.0096
5contigency1118162118162
6Mulching Materials123.03181.6922353.3207
7Sand (mortar)259.8317.384515.8454
8Tansportation of water110001000
9पत्‍थर260.25432.6112584.15
10मिटटी परिवहन123.0311.591425.9177
Total Material 281000