State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: DIWAL
Work Code: 1725007024/RC/22012034228733 (सी.सी.रोड कार्य सह नाली निर्माण गणपत कालू के घर झि)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/6/2013 Work start date : 30/8/2014
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 208@@,.// Sanction Date : 1/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost MGNEGA Panchparmeshwar scheme3 Total
207000 138000 0 0 0 647000 0 785000 0 992000
Financial Sanction Details
Financial\Administrative Sanction No: 13@@,.// Financial\Administrative Sanction Date 20/10/2013
Fin. Sanc. Amt. (in Rs) NREGA:345000 MGNEGA
0
Panchparmeshwar
647000
Scheme 3
0
Total
992000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil254.981.220697.88
2Dag-beling-Double spade "v" shaped stroke 100mm deep10710.5535.5
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)222.133177.8705884.714
4Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used222.13118.626344.618
5False work for R.C.C. and P.C.C. work in plinth and foundation321.3154.249544.46
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)3576.32249.1
7Collection of approved soil having CBR not less then 12, including stacking at quarry.229.41118.827253.908
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 229.417.51720.575
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 222.13408885.2
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.373.79140.6352566.0877
11Transportation rates for Hume pipes (NP-3) 800 mm to 900 mm dia.6365.262191.56
12Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7229.4123.65414.076
13Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.62295.513773
141902 Transportion of metal188.81214.540499.745
15work charge13193931939
16Fixing of Information board with diging pits and grout in cement concret mixture (1:2:4). Mandays per board125002500
Total Activity 992000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL180.311000180310
2Cement03100
3CEMENT(BEGS)1344310416640
4Centering and Shuttering321.38025704
5contangency and work charges0477610
6Display board120002000
7Drinking Water Facilities056520
8Gunny BAG040
9HumePipes6350021000
10Mason (semi skilled)183005400
11Mate181953510
12mixer machin (perday)1285010200
13NEARBADA SANT020000
14PhotoCopy & Stationary3100300
15Photograph450200
16Plastic180008000
17sand cum91.2180072968
18TESTING CHARG125002500
19Transportaion of muram (trip)7620015200
20Transpotation Charges1268268
21Vibrator (Per Day)124004800
22Water With Tenkar4040016000
Total Material 785000