S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Transportation of metal | 0 | 0 | 0 |
2 | Transportation of metal | 65.69 | 187.45 | 12313.5905 |
3 | Labour only for boulder soling hand packed excluding consolidation. | 65.69 | 106.2 | 6976.278 |
4 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Tank Work | 38.12 | 108 | 4116.96 |
5 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 65.69 | 100.3 | 6588.707 |