State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: KHADAUA(P)
Work Code: 1703004016/WC/22012034666498 (CTR Loose Boulder Sirnam Singh ke khet ke pass Ramajipur)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/4/2021 Work start date : 26/4/2021
Present status : Non-existent Proposed Status : Constr of Boulder Anicut Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 1703004/2021-2022/171384/TS Sanction Date : 22/4/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
452920.82 337173.28 690.15 7289.44 0 0 0 346000 0 798073.69
Financial Sanction Details
Financial\Administrative Sanction No: 1703004/2021-2022/171384/AS Financial\Administrative Sanction Date 22/4/2021
Fin. Sanc. Amt. (in Rs) NREGA:798362 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
799000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.2806.645251860.67
2(a) C.C. 1:2:4 (1cement, 2sand, 4metal)30.43823.54177631579116235.67
3Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite.287645.248641114983185186.36
4(c) Masonry stones, pitching stones or boulders28744.163240418118512674.85
5(XXIX) 50 Km. Lead25.84569.36300309597514712.34
6(XXVI) 35 Km. Lead287628.733484320558180446.51
7(XVIII) 16 Km. Lead6.69257.7982062780271724.67
8(XX) 20 Km. Lead13.07289.4139250191283782.64
9(b) Dense or hard soil1875148.333237333333278124.82
10Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13613.853613.85
Total Activity 799000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper3.058852699.25
20084-Hire charges of Diesel truck - 9 tonne (without POL)0.671822421506.1756
30297-Stone Aggregate(single size): 10 mm nominal size3.3446302106.72
40367-Portland Cement10.0609551155445.6199
50368-White cement 0.0004157446.2976
60983-Fine sand (zone IV)13.7271076.2514773.68375
71235-Diesel oil23.5971681604.6028
85001-Mobil oil0.8476182.9155.02604
97900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
10MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT15.8735258333.325
11MR6032-Snowcem/ durocem0.00072778919.4523
12MR6034-Blaster (Semi-Skilled)2.873511007.37
13MR6035-Gelatine (80%)54.5365.63577.168
14MR6036-Electric detonator28716.44706.8
15MR6037-Fuse coil (10m long)86.18.2706.02
16MR6038-Drilling of holes 25mm dia 0.75m deep215.2561.5113240.0275
17MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)6.7126824577.584
Total Material 116000