S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 6.75 | 81.2 | 548.1 |
2 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 0.119 | 3234.3 | 384.8817 |
3 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand) | 1.625 | 2250.9 | 3657.7125 |
4 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime mortar 1:3 (1lime putty, 3sand) | 4.818 | 2334.4 | 11247.1392 |
5 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand) | 23.3 | 85.8 | 1999.14 |
6 | Cutting out cracks of roof terrace to V-Section, cleaning out wetting, grouting with cement and sand slurry 1:3 (1 cement, 3 sand) | 1.482 | 2343.8 | 3473.5116 |
7 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 1.875 | 390.36 | 731.925 |
8 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 1 | 4000 | 4000 |
9 | SIGN BOARD | 1 | 1500 | 1500 |
10 | Labour difference in case of old SoR | 1 | 12400 | 12400 |