S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 30 | 70.6 | 2118 |
3 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 70.9347 | 145.4 | 10313.90538 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 90 | 3089.9 | 278091 |
5 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 90 | 169.4 | 15246 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 90 | 164.1 | 14769 |
7 | Transportation of 20 MM metal | 6 | 1000 | 6000 |
8 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Dence or hard soil | 400 | 10.2 | 4080 |
9 | Providing and laying in trenches galvanised mild steel tubes (medium grade) of the following nominal bore, tube fittings (earth work in trenches to be measured and paid for separately)-100 mm dia. | 3 | 460.7 | 1382.1 |