State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: KISHORGARH(P)
Work Code: 1703004013/DP/22012034236415 (Shanti dham nirman Tekpur)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2016 Work start date : 16/11/2016
Present status : Not Exist Proposed Status : Land development
Tech Sanction Details
Technical Sanction No. : 2560/13 Sanction Date : 5/11/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
721464 698288 0 0 0 0 0 699000 0 1419752
Financial Sanction Details
Financial\Administrative Sanction No: 86/13 Financial\Administrative Sanction Date 8/11/2016
Fin. Sanc. Amt. (in Rs) NREGA:1419750 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1420000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard140004000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.25004.411000
3Contingency1120700120700
4Dag-beling-Single spade stroke minimum 75mm deep2000.360
5Dag-beling-Double spade "v" shaped stroke 100mm deep5700.3171
6Filling foundation and around masonry work with moorum I/c ramming layers and watering.3.2158.3506.56
7Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.32.0688228276.92
8Labour only for item no.040632.06467.314981.638
9Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)45.63307.4150817.44
10Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.583307.45225.692
11Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)2.232202.34911.129
12Labour only for item no. 0413 (for any proportion of cement concrete)45.645820884.8
13False work for R.C.C. and P.C.C. work in plinth and foundation10.56147.81560.768
14Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.314.931079339809.47
15Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:2 (1lime putty, 2sand)10.541858.719590.698
16Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height15059.18865
17Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing18127.62296.8
18Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing855127.6109098
19Labour only for item no.1035, 1036 and 1037-Raised and cut pointing855109.793793.5
20Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.63 mm thick sheet.19.2609.811708.16
21Second class brick flooring laid dry grouted with C.M. 1:6 i/c finishing the joints flush.40338.513540
22Transportation of metal 853.859.150459.58
23Transportation of sand1125123.03138408.75
24Transportation rates for Masonry stone.135228.3330824.55
25Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN112585.896525
26Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work81052.742687
27Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil8.9396.2859.066
28Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil160.3196.215421.822
29Collection of soft moorum including stacking at quarry.112552.759287.5
30Collection of hard moorum including stacking at quarry.13552.77114.5
31Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-2 (Size ranging from 63 mm to 45 mm)32.0649015709.4
Total Activity 1420000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL40.111188.747678.757
240 M.M. METAL34.06136.74656.002
3Bricks200048000
4CEMENT (BEGS)36227097740
5Display board15227152271
6Iron angles, Trusses, wind tie853.859.150459.58
7Iron Sheet19.2609.811708.16
8R.R. stone (other than granite12500060000
9Sand30.931008.7331200.0189
10Transportation146.05101.3414800.707
11खंडा परिवहन325506.94164755.5
12मुरम परिवहन1260123.03155017.8
Total Material 699000