S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 4000 | 4000 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 2500 | 4.4 | 11000 |
3 | Contingency | 1 | 120700 | 120700 |
4 | Dag-beling-Single spade stroke minimum 75mm deep | 200 | 0.3 | 60 |
5 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 570 | 0.3 | 171 |
6 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 3.2 | 158.3 | 506.56 |
7 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 32.06 | 882 | 28276.92 |
8 | Labour only for item no.0406 | 32.06 | 467.3 | 14981.638 |
9 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 45.6 | 3307.4 | 150817.44 |
10 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 1.58 | 3307.4 | 5225.692 |
11 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 2.23 | 2202.3 | 4911.129 |
12 | Labour only for item no. 0413 (for any proportion of cement concrete) | 45.6 | 458 | 20884.8 |
13 | False work for R.C.C. and P.C.C. work in plinth and foundation | 10.56 | 147.8 | 1560.768 |
14 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 314.93 | 1079 | 339809.47 |
15 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:2 (1lime putty, 2sand) | 10.54 | 1858.7 | 19590.698 |
16 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 150 | 59.1 | 8865 |
17 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 18 | 127.6 | 2296.8 |
18 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing | 855 | 127.6 | 109098 |
19 | Labour only for item no.1035, 1036 and 1037-Raised and cut pointing | 855 | 109.7 | 93793.5 |
20 | Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.63 mm thick sheet. | 19.2 | 609.8 | 11708.16 |
21 | Second class brick flooring laid dry grouted with C.M. 1:6 i/c finishing the joints flush. | 40 | 338.5 | 13540 |
22 | Transportation of metal | 853.8 | 59.1 | 50459.58 |
23 | Transportation of sand | 1125 | 123.03 | 138408.75 |
24 | Transportation rates for Masonry stone. | 135 | 228.33 | 30824.55 |
25 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 1125 | 85.8 | 96525 |
26 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work | 810 | 52.7 | 42687 |
27 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 8.93 | 96.2 | 859.066 |
28 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 160.31 | 96.2 | 15421.822 |
29 | Collection of soft moorum including stacking at quarry. | 1125 | 52.7 | 59287.5 |
30 | Collection of hard moorum including stacking at quarry. | 135 | 52.7 | 7114.5 |
31 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-2 (Size ranging from 63 mm to 45 mm) | 32.06 | 490 | 15709.4 |