S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 12.645 | 2620.94 | 33141.7863 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 186.2 | 1243.92 | 231617.904 |
4 | Dag-beling-Single spade stroke minimum 75mm deep | 345.5 | 945.5 | 326670.25 |
5 | For architrave moulding, railings for stairs, cornices and moulded beading etc. For any shape pattern or dealings add to item no.0702. | 89.33 | 1243.92 | 111119.3736 |
6 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 85.793 | 1243.92 | 106719.62856 |
7 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 8.5 | 1243.92 | 10573.32 |