Work Code: 1743002026/RC/22012034310364 (ग्राम डगावाशंकर में भीलट बाबा चबूतरा से माचक नदी की ओर 200 मी सीसी रोड सह नाली निर्माण)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/8/2015 Work start date : 5/4/2016
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 26/624 Sanction Date : 22/3/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost PANCHPARMESHAWAR scheme2 scheme3 Total
131400 87600 0 0 485100 0 0 573000 0 704100
Financial Sanction Details
Financial\Administrative Sanction No: 26/8 Financial\Administrative Sanction Date 30/3/2016
Fin. Sanc. Amt. (in Rs) NREGA:219000 PANCHPARMESHAWAR
485100
Scheme 2
0
Scheme 3
0
Total
705000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Dag-beling-Double spade "v" shaped stroke 100mm deep6000.5300
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead3698.43542.4
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)603396.5203790
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)722498.6179899.2
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)223539.977877.8
7False work for R.C.C. and P.C.C. work in plinth and foundation373.33121.445322.262
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars816.3353.843918.554
9Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.333.29387.56129169.8724
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work3691.23283.2
11Collection of hard moorum including stacking at quarry.10214714994
Total Activity 705000
S.NoMaterialQuantityUnit PriceTotal
1Cement29230087600
2Convergence Amount1485100485100
3pf RCC hume pipe 1000000
Total Material 573000