S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 0.66 | 145.4 | 95.964 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 0.31 | 2160.9 | 669.879 |
3 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime mortar 1:3 (1lime putty, 3sand) | 0.88 | 3314.8 | 2917.024 |
4 | Half brick masonry in class 25 open bhatta or pajawa burnt brick in super structure including placing of 6mm iron bar at every 3rd layer of brick.-In cement mortar 1:3 | 1.4 | 457.2 | 640.08 |
5 | Honey comb brick masonry with class 25 open bhatta or pajawa burnt brick 10cm Thick.-In cement mortar 1:3 | 4 | 258.6 | 1034.4 |
6 | Providing 6mm thick corrugated asbestos cement sheets roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm dia. G.I. plain and bitumen washer complete excluding the cost of purlines rafters and trusses. | 1.54 | 294.5 | 453.53 |
7 | White washing whith lime on undecorated wall surfaces (3coats) to give an even shade including thoroughly broomed the surface to remove all dirt, dust, mortar drops and other foreign matter. | 54.92 | 6.5 | 356.98 |
8 | Collection of quarried stone or rubble.-Maximum size 0.014 cum | 5.09 | 120.3 | 612.327 |
9 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 22.55 | 112.8 | 2543.64 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 11.25 | 55.8 | 627.75 |