S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1500 | 1500 |
2 | Work charge | 1 | 23000 | 23000 |
3 | Transportation of metal | 1900 | 114.1 | 216790 |
4 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Loose or soft soil | 9200 | 8 | 73600 |
5 | Rolling & compacting of B.T. surface for Surface dressing coat or pre mix carpet or seal coat with power roller exceeding 8 tonne.-Including hire and running expenses of roller | 4200 | 4.7 | 19740 |
6 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 4200 | 60.2 | 252840 |
7 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti | 821 | 414.5 | 340304.5 |
8 | 1902 Transportion of metal | 1600 | 208.4 | 333440 |