Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 04:22:44 AM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: CHHAIGAON DEVI
Work Code: 1725006015/IF/9926703649 (क0धा0कुप निर्माण दिनेश धन्‍नालाल छैगा्ंवदेवी)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 10/2/2014 Work start date : 12/2/2014
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 2578/2014 Sanction Date : 10/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
141000 94000 0 0 0 0 0 94000 0 235000
Financial Sanction Details
Financial\Administrative Sanction No: 120/2014 Financial\Administrative Sanction Date 12/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:235000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
235000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises000
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil43.1950.22168.138
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil22550.211295
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead140.6321.93079.797
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)6.33341821635.94
6False work for R.C.C. and P.C.C. work in plinth and foundation127154.219583.4
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars17865.911730.2
8Stacking and boxing.-Moorum or sand4.51567.5
9FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 60 mm nominal size4.5150.4676.8
10FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders13.5348.34702.05
11Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil2890.12522.8
12Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum28117.13278.8
13Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)6228817856
14Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.193.6577.26111757.536
15work charge12440024400
Total Activity 235000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL67614566
2BULLOCK CART2550012500
3Cement3930511895
4Centering and Shuttering127105.913449.3
5Contagecny2700014000
6Display board115001500
7hol3057021350
8IRON SARIYA651288320
9MASON (PERDAY)63502100
10Pipe550250
11sand (t)7.195654062.35
Total Material 94000