S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 9000 | 6.64524111111111 | 59807.17 |
2 | (II) Lead upto 150 meters | 5062.5 | 73.6053748148148 | 372627.21 |
3 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 3.6 | 3175.78333333333 | 11432.82 |
4 | (c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size) | 0.75 | 5310.81333333333 | 3983.11 |
5 | (e) In Cement mortar 1:6 (1cement, 6sand) | 10.5 | 2865.65238095238 | 30089.35 |
6 | (XXIX) 50 Km. Lead | 76.5 | 797.107973856209 | 60978.76 |
7 | (XXX) 60 Km. Lead | 7.5 | 597.266666666667 | 4479.5 |
8 | (b) 1000 mm dia. | 7.5 | 3768.24 | 28261.8 |
9 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete. | 5062.5 | 17.3729362962963 | 87950.49 |
10 | Stripping the seat of embankment of all foreign materials, vegetation and other growth like grass grass roots etc. and removing and rubbish up to a suitable distance including dressing but excluding jungle clearance etc. complete. | 1350 | 149.82782962963 | 202267.57 |
11 | a (i) Loose or soft soil for Road Work | 5062.5 | 100.975670123457 | 511189.33 |
12 | (a) Loose or soft soil | 10.8 | 90.8074074074074 | 980.72 |
13 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 300 | 370.2558 | 111076.74 |