State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: DEVRA
Work Code: 1713004041/AV/22012034654578 (Samudayik Park Nirman (Boundary wll and Paver) MS Devra Parisar)
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 14/4/2023 Work start date : 5/3/2024
Present status : NEW Proposed Status : Constr of GP for community
Tech Sanction Details
Technical Sanction No. : 279/41/2023 Sanction Date : 4/10/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Performance Grant scheme2 scheme3 Total
117000 0 0 0 732000 0 0 732000 0 849000
Financial Sanction Details
Financial\Administrative Sanction No: 892/1/41/2024 Financial\Administrative Sanction Date 5/10/2023
Fin. Sanc. Amt. (in Rs) NREGA:117000 Performance Grant
732000
Scheme 2
0
Scheme 3
0
Total
849000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.2607.021825.2
2Work charge260497.88129448.8
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil52212.411044.8
4Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil100.8186.818829.44
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)1.64366.896987.024
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)7.2369226582.4
7Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)24.186494157024.92
8Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)30.285145.2155796.656
9Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height987.9110.7109360.53
10Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars948.9192.687869.066
1110mm thick cement plaster on fair side of wall in-Cement mortar 1:5 (1cement, 5sand)205.8140.628935.48
1215mm thick cement plaster on rough side of wall in-Cement mortar 1:5 (1cement, 5sand)205.8183.437743.72
13Cement washing (Portland cement) 3 coats.-White cement411.632.113212.36
14Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural261073.627913.6
15SIGN BOARD120002000
16Setting out work (Reference pillars referencing bench mark and temporary bench mark):Painting/Marking of Reference/Working Bench Mark over existing permanent structure Fixing of Reference pegs made of local rough wood for making centre line and toe lines. Fixing of reference poles made of bamboos or jungle wood bellies etc.13400034000
Total Activity 849000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount1732000732000
Total Material 732000