S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 113.5 | 73.4 | 8330.9 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 100.09 | 3002.1 | 300480.189 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 0 | 0 | 0 |
4 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 60.09 | 108.7 | 6531.783 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation | 450.5 | 147.4 | 66403.7 |
6 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 2000 | 6.3 | 12600 |
7 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 100.18 | 105.3 | 10548.954 |
8 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 100.18 | 1.5 | 150.27 |
9 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 160.09 | 36.5 | 5843.285 |
10 | Transportation of metal | 150.07 | 204 | 30614.28 |
11 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 140.24 | 133.76 | 18758.5024 |
12 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 150.18 | 21.3 | 3198.834 |
13 | work charge | 1 | 21000 | 21000 |