Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:46:39 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SHYAMPUR(P)
Work Code: 1703004074/RC/22012034178229 (खरंजा निर्माण जीवनलाल के खलिहान से हनुमान जी के मन)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 12/8/2013
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 74/245 Sanction Date : 17/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
86586 40584 0 0 0 0 0 40600 0 127170
Financial Sanction Details
Financial\Administrative Sanction No: 74/3 Financial\Administrative Sanction Date 19/6/2013
Fin. Sanc. Amt. (in Rs) NREGA:127170 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
128000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency16208.226208.22
2Dag-beling-Single spade stroke minimum 75mm deep1960.239.2
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.294215.763415.8
4Stacking and boxing.-Moorum or sand90.4110.5949.305
5Transportation rates for Masonry stone.44.1453.0419979.064
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.90.41191.1617282.7756
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.90.41413706.81
8Collection of hard moorum including stacking at quarry.90.41130.811825.628
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.29412.83763.2
Total Activity 128000
S.NoMaterialQuantityUnit PriceTotal
1contangency and work charges12722.162722.16
2PhotoCopy & Stationary1600600
3खण्‍डा परिवहन44.1453.0419979.064
4मुरम परिवहन (1)90.41191.1617282.7756
Total Material 40600