S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works) | 625 | 1.123792 | 702.37 |
2 | (a) Dense or hard soil (PT/60/60) | 135 | 185.799111111111 | 25082.88 |
3 | Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine. | 630 | 3.05103174603175 | 1922.15 |
4 | Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed. | 630 | 85.688619047619 | 53983.83 |
5 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 4175.75 | 4175.75 |
6 | Filling dug pits with manure/compost for dug-pit size 0.60x0.60x0.60 m (using Manure and Excavated earth for filling) | 625 | 13.3792 | 8362 |
7 | (I) Pit Size : 0.60 x 0.60 x 0.60 m, height less than 1.5 feet | 877 | 18.5546180159635 | 16272.4 |
8 | Watering, Weeding, Hoeing, Training, Pruning, Mulching, Stacking, Bunding, along sides (thala making), filling the soil in and around the plant spraying insecticide/pesticide, putting required manure and fertilizer etc, full supervision (only in case of survival more than 80%) for first year (for block plantation) | 625 | 186.728208 | 116705.13 |
9 | Watering, Weeding, Hoeing, Training, Pruning, Mulching, Stacking, Bunding, along sides (thala making), filling the soil in and around the plant spraying insecticide/pesticide, putting required manure and fertilizer etc, full supervision (only in case of survival more than 80%) for second year (for block plantation) | 625 | 195.428976 | 122143.11 |
10 | Watering, Weeding, Hoeing, Training, Pruning, Mulching, Stacking, Bunding, along sides (thala making), filling the soil in and around the plant spraying insecticide/pesticide, putting required manure and fertilizer etc, full supervision (only in case of survival more than 80%) for 3rd Year/4th Year/5th Year (for block plantation) | 1875 | 195.428976 | 366429.33 |
11 | Providing earthen pot , to be laid in the soil after planting.(labour component included in the activity of watering) | 252 | 50 | 12600 |
12 | (VIII) 81 to 100 km | 877 | 2.7627251995439 | 2422.91 |
13 | Providing Bucket/Can for carrying water for watering plants for community plantation | 6 | 750 | 4500 |
14 | Maintenance of the bicycle of paudhrakshak | 5 | 500 | 2500 |
15 | Supervision Charges for GP in Community Plantation and खेत की मेड पर वृक्षारोपण (individual plantation) Per Year | 5 | 2000 | 10000 |
16 | Supervision Charges for Paudhrakshak for Road side/Canal side/ Community block/ Community compound Plantation Per Year(पर्यवेक्षण शुल्क पौधरक्षक, प्रतिवर्ष हेतु : सड़क किनारे/ नहर किनारे / सामुदायिक/ सार्वजनिक परिसर हेतु वृक्षारोपण ) | 5 | 2000 | 10000 |