Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:01:30 PM 
Back  
State: MADHYA PRADESH District: DHAR Block: MANAWAR Panchayat: Rajukhedi
Work Code: 1722011002/IF/1140 (कपिलधारा (राधेश्‍याम गुलसिंह मानसिंह) राजूखेडी (1.)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 14/4/2011 Work start date : 15/5/2012
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 1991 Sanction Date : 19/10/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
85000 57000 0 0 0 0 0 57000 0 142000
Financial Sanction Details
Financial\Administrative Sanction No: 00_47 Financial\Administrative Sanction Date 25/10/2011
Fin. Sanc. Amt. (in Rs) NREGA:142000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
142000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)5.8172605.815157.9386
2False work for R.C.C. and P.C.C. work in plinth and foundation96.45112.310831.335
3Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars214.9847.710254.546
4Extra rates for quantities of work executed . in or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)68.67108.57450.695
5Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work16.951001695
6Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work39.56110.954389.182
7Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work19.62312.436129.8766
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work156.96495.4677767.4016
9contingency180008000
Total Activity 142000
S.NoMaterialQuantityUnit PriceTotal
1Blasting Holas2728021760
2Cement(bori)362709720
3Contagecny126002600
4deasil pump202004000
5false (work) (sentring)96.43706750.1
6Gitti 20 MM210002000
7IRON SARIYA215408600
8Transportaion of sand (Trip)115001500
Total Material 57000