State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: PUR
Work Code: 1702001029/RC/22012034195374 (C.C.Road Dr. Mardan singh ke ghar se bhoop singh k)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 15/8/2013 Work start date : 23/12/2013
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 144/2013-14 Sanction Date : 20/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
89280 59520 0 0 299900 0 0 360000 0 448700
Financial Sanction Details
Financial\Administrative Sanction No: 04/144/2013-14 Financial\Administrative Sanction Date 2/10/2013
Fin. Sanc. Amt. (in Rs) NREGA:148800 Panchparmeshwar
299900
Scheme 2
0
Scheme 3
0
Total
449000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard134703470
2Dag-beling-Double spade "v" shaped stroke 100mm deep430.50.5215.25
3Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.80.216504.840493.0368
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)91.6962928.1268495.0576
5False work for R.C.C. and P.C.C. work in plinth and foundation167.464127.321318.1672
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)255.436.11558.123
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 80.2167.5601.62
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 91.696403667.84
9Transportation of metal 77.948578.245069.5336
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.13547835478
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work108.91681.28843.9792
12contingency11950919509
Total Activity 449000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)230258.7859519.4
2Convergence Amount1299900299900
Total Material 360000