S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 7500 | 1.5 | 11250 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 4900 | 3.7 | 18130 |
3 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 1565.66 | 19.8 | 31000.068 |
4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 1200 | 32.4 | 38880 |
5 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 13.5 | 131.4 | 1773.9 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 12.32 | 2846.06 | 35063.4592 |
7 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 10.45 | 2250.09 | 23513.4405 |
8 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 12.32 | 149.2 | 1838.144 |
9 | False work for R.C.C. and P.C.C. work in plinth and foundation | 36.1 | 132.3 | 4776.03 |
10 | Transportation of metal | 1200 | 128.07 | 153684 |
11 | Transportation of 20 MM metal | 10.47 | 513.03 | 5371.4241 |
12 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 4.43 | 174.3 | 772.149 |
13 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 10.08 | 300.6 | 3030.048 |
14 | Transportation of sand | 14.2 | 265.57 | 3771.094 |
15 | Transportation rates for Hume pipes (NP-3) 800 mm to 900 mm dia. | 7.5 | 450.25 | 3376.875 |
16 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia. | 7.5 | 2427.1 | 18203.25 |
17 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 1222 | 21.6 | 26395.2 |
18 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 1200 | 26.2 | 31440 |
19 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 1733.59 | 73.4 | 127245.506 |
20 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 11.2 | 79.9 | 894.88 |
21 | Collection of hard moorum including stacking at quarry. | 1200 | 118.3 | 141960 |
22 | SIGN BOARD | 1 | 2500 | 2500 |
23 | Labour difference in case of old SoR | 2572 | 14 | 36008 |