State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: BARHA BADA
Work Code: 1734004056/RC/44 (आंतरिक मिटटी बजरा कार्य माखन से पुल तक)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 1/4/2012 Work start date : 14/5/2012
Present status : Earthern road Proposed Status : Sand Moram
Tech Sanction Details
Technical Sanction No. : 102/12-13 Sanction Date : 18/4/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
120300 63300 0 0 0 0 0 63300 0 183600
Financial Sanction Details
Financial\Administrative Sanction No: 05/012-13 Financial\Administrative Sanction Date 20/4/2012
Fin. Sanc. Amt. (in Rs) NREGA:183600 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
184000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.24003.48160
2Contingency1401401
3Collection of approved soil having CBR not less than 5, including stacking at quarry.59475.444787.6
4Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.594114.367894.2
5Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.759419.711701.8
6Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN14481.711764.8
7Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work573.667.838890.08
Total Activity 184000
S.NoMaterialQuantityUnit PriceTotal
1contigency010
2Rolling Compaction14481.711764.8
3sing bord132003200
4Transpotation of Mooram59481.3648327.84
Total Material 63300