Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:19:50 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KISUPURA
Work Code: 1702001014/WC/22012034571097 (नवीन तालाब निर्माण दादा की बगिया के पास )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 11/5/2020 Work start date : 21/7/2020
Present status : Non-existent Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 1702001/2020-2021/331960/TS Sanction Date : 2/9/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
479550.5 99829.18 0 20529.6 0 0 0 121000 0 599909.28
Financial Sanction Details
Financial\Administrative Sanction No: 1702001/2020-2021/331960/AS Financial\Administrative Sanction Date 2/9/2020
Fin. Sanc. Amt. (in Rs) NREGA:599909 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
600000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Construction of embankment/sub grade by fly ash including clearing & grabbing existing surface, (as per clause 305 and its sub clauses where required and as per IRC SP-58-2001) i/c all lifts, cost of spreading, watering, compaction and maintenance of surface during construction to ensure shedding and preventing ponding of water, providing camber, shaping and dressing, finishing etc. complete. (lead for fly ash will be paid extra excluding loading)7857.49974358974364484.98
222cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.416202.21350961538584120.82
3(a) Loose or soft soil4420112.502800904977497262.38
4Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.39003.6001794871794914040.7
Total Activity 600000
S.NoMaterialQuantityUnit PriceTotal
17753-Boulder 50 mm to 200 mm124.814718345.6
2MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver17.5570812425.4
Total Material 30800