S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 1.8 | 882 | 1587.6 |
2 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 8.25 | 3307.4 | 27286.05 |
3 | Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:8 (1cement, 8sand) | 74.25 | 1858.1 | 137963.925 |
4 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 165 | 78.5 | 12952.5 |
5 | Transportation of metal | 16.91 | 451.7 | 7638.247 |
6 | Transportation of sand | 35.09 | 377.73 | 13254.5457 |
7 | Transportation rates for Masonry stone. | 74.25 | 384.58 | 28555.065 |
8 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 3.26 | 123.03 | 401.0778 |
9 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 5.64 | 177.93 | 1003.5252 |
10 | SIGN BOARD | 1 | 5000 | 5000 |
11 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 140.25 | 52.7 | 7391.175 |
12 | contingency | 1 | 8966.2893 | 8966.2893 |