State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: MADHI KALA
Work Code: 1713004079/RC/22012034320302 (सुदूर ग्राम संपर्क सडक अहिरान बस्‍ती से नवाचार टोला तरफ 700 मीटर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2016 Work start date : 17/1/2017
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 4079/1394 Sanction Date : 1/12/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
300000 475000 0 0 0 0 0 475000 0 775000
Financial Sanction Details
Financial\Administrative Sanction No: 1394/11 Financial\Administrative Sanction Date 2/12/2016
Fin. Sanc. Amt. (in Rs) NREGA:775000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
775000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises53751.68600
2Dag-beling-Single spade stroke minimum 75mm deep4800.3144
3Transportation of metal 513.148912.41468201.36668
4Transportation of metal 74.161512.02112131.4032
5Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia4964.43857.6
6Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making294.1721.66354.072
7Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor292.52236727.96
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work73.54287.36420.2166
9Collection of puddle earth including stacking at quarry74.161140.784594.312
10Collection of hard moorum including stacking at quarry.74.16640.247477.232
11SIGN BOARD159345934
12Labour difference in case of old SoR15015923850
Total Activity 775000
S.NoMaterialQuantityUnit PriceTotal
12043 soil Compaction material1500500
2Compaction of Earth Work294.1716.94971.473
3Compaction of GSB12500025000
4Compaction of Selected soil292.1719.95814.183
5contigency11710017100
6earth work watring110001000
7GITTI14500045000
8Gravel or moorum12500025000
9Hard Moorum Transportation1150000150000
10hume pipe6964.45786.4
11Soil transport15000050000
12sub grade watring150005000
13Transportation charges11500015000
14Transportation of GSB15000050000
15watering110001000
16गेंती110001000
17तसला पीबीसी110001000
18बोर्ड112001200
19मुरम12500025000
20रोलर14500045000
Total Material 475000